The Creekside development is configured into five sections in three quadrants (southeast, northwest and southwest):
- The Meadows at Creekside on the southeast corner includes single-family homes, townhomes and apartments.
- Old Town at Creekside on the southeast corner will include a hotel, apartments, retail and restaurant space as well as public green space.
- Creekside Commons on the northwest corner will include three hotels, retail and restaurant space, apartments, office space and the baseball fields.
- The Woods at Creekside/Creekside Village on the northwest corner includes single-family homes and townhomes.
- Creekside Industrial on the southwest corner includes 29 industrial lots.
Southeast Quadrant
Old Town at Creekside will have 13 lots for six restaurants, two mixed-use retail buildings, one cafe, one grocery/market, one hotel and one bank.
Final Development Plan
The following have been issued a Parkville business license:
- Anytime Fitness, 15279 Brink Meyer Road
- Ten & Two Coffee, 15309 Brink Meyer Road
- Johnny’s Tavern, 15249 Brink Meyer Road
The following are in the planning stages or under construction:
- Mixed-use buildings (retail on the 1st floor and class-A apartments above) with green space for stage and yard games are in the planning stages or under construction
- Taco Bell, Lot 11
The Meadows at Creekside has 216 apartment units; 80 town home units, maintenance provided; and 124 single-family homes that are currently under construction.
Final Development Plan
Northwest Quadrant
The Woods at Creekside & Creekside Village has 118 single-family homes and 44 town home units that are currently under construction.
Final Development Plan
Creekside Commons will have 10 lots for three hotels, three two restaurants, one gas station, one pharmacy/medical office and one mixed-use retail building.
The following have been constructed at Creekside Commons:
- Creekside Baseball Park, 15900 Long Ball Street
- The Station 4, 7201 Homer Parkway
- Burger King, 16055 Round Tripper Drive
Southwest Quadrant
Creekside Industrial is a planned industrial development consists of a 72,800 square foot building for office, warehouse and shop uses. The building will serve as the new headquarters for Capital Electric Line Builders, Inc., which specializes in the installation and maintenance of overhead and underground transmission and distribution systems, substations, traffic signalization, and roadway and area lighting.
Final Development Plan
Development at Intersection of I-435 and Highway 45
In October 2018, the City approved final development plans for a multi-phased project consisting of residential, commercial, industrial and recreation uses along the I-435 and Highway 45 corridor.
- Incentives Presentation to Board of Aldermen 3/19/19
- Real Estate Agreement Presentation to Board of Aldermen 3/5/19
The Planning & Zoning Commission held public hearings to consider applications for developments at I-435 and Highway 45 on September 11, October 9, October 10 and November 13, 2018. Links to the packets for the public hearings are on the City’s website at http://parkvillemo.gov/boards-commissions/planning-zoning-commission/2018-meetings/.
The Board of Aldermen considered these applications during meetings held on October 31, November 6, December 4 and December 18, 2018. Links to the packets are on the City’s website at http://parkvillemo.gov/government/board-of-aldermen/2018-meetings/.